Specialized
Post-construction cleanup
After the GC says it's done. Fine dust, stickers, track grit, and the bathroom that was used by the trades. We walk it first if the date looks optimistic.

Fit-outs, warehouse office buildouts, and renovated common areas.
What the visit covers
- Detail dust of surfaces, sills, and tracks
- Floors scrubbed
- Glass and fixtures
- Labels and adhesive
When it happens
A booked project day, once trades are out and floors are down.
Scope it
Put this on a proposal.
Name the building and the frequency. If this is one part of a larger contract, say that in the notes.